Stevenson Site Improvements (Auditorium Building)

Stevenson Elementary School aerial view

Project Budget: $2.4 Million
Construction Starts: Summer 2019
Projected Opening: Fall 2020

Overview:

The District is addressing repair of the fire damages at the Auditorium Building, as well as modernization work listed below:

  • HVAC installation in cafeteria, kitchen and supporting spaces.
  • Campus-wide fire alarm upgrades.
  • Electrical upgrades.
  • Accessibility upgrades to path of travel (POT), parking, restrooms, drinking fountains, etc.
  • New Audio Visual systems and controls (incl. projectors and screens) in Auditorium.
  • Interior/Exterior upgrades to finishes (e.g. ceiling, flooring, paint, etc.).
  • New interior LED lighting.
  • Replace or repair existing windows/glazing.

 

Additional Information:

 

Stevenson Site Improvements

 

Location:
515 Lime Avenue
Long Beach, CA 90802

Project Manager Planning:
Ferdows Fazeli

Project Manager Construction:
Dan Barr

Construction Manager:
Linik CORP.

Architect:
Ghatode Bannon Architects

Contractor:
Graves Construction Group

School Website